Project Overview

Metro-Mechanical recently completed a project at the Hollywood Casino in Tunica, Mississippi.

The project consisted of three (3) 100% OSA units to replace three packaged units that were not providing adequate cooling.

During the course of this project Metro Mechanical installed approximately 800' of high pressure gas piping.  

Metro was also responsible for the structural steel, roofing and sheet metal associated with the installation of the new units.

 

Structural steel frame installed on 8-story hotel.tel

.100% OSA unit installed on 8-story hotel

100% OSA unit installed on 8-story hotel